Project carried out for: Strabag Sp. z o.o.
Place: Bialystok, PL
Realization: 2014/2015
The scope of works: reconstruction of the boiler plant wall and disassembly of the gas ducts, delivery and assembly of the supporting structure (about 200 t), containment (about 200 t), flue gas ducts of 16Mo3 and 16CrMo4-5 steel (50 t), thermal insulation of the ducts and the reactor